September 6th 2016. Work on the tunnel floor (and lead-in at both ends) has begun. As well as putting gravel down they have been working on allowing the spring to flow away in a more controlled way.
Images have been resized to fit the format. Click on a photo to view a larger version. Opens in a new window.